Comparison of the existing and calculated blast design parameters for the rock mass conditions at Bamesso-Latet rock quarry

Authors

  • Safianou Ousmanou Laboratory of Environmental Geology, University of Dschang, P.O. Box 67, Dschang, Cameroon
  • Ndapeh Nd. Blaise Divisional Delegation of Ministry of Mines, Industry and Technological Development, Koupe-Manengouba /South west, Cameroon
  • Fozing Eric Martial Laboratory of Environmental Geology, University of Dschang, P.O. Box 67, Dschang, Cameroon

DOI:

https://doi.org/10.3126/jngs.v60i0.31273

Keywords:

Bench Blasting, Blast design parameters, Bamesso-Latet rock quarry, Application of Langefors’s method

Abstract

Blasting is the most cost effective methodology to break rock for mining engineering applications. A good production blast will break only the rock that is needed to be removed, leaving the host rock with minimal damage. Accurate measurement of blast, fragmentation is important in mining and quarrying operations, in monitoring and optimizing their design. Currently, there are several methods available to predict damage due to blasting. The accuracy of many of these methods is questionable, and in most cases, the methodologies over predict the results. This paper presents a practical method (i.e. Langefors’s method) that we shall use in Bamesso-Latet rock quarry to do a comparison between the existing and calculated blast design parameters. The proposed method allows to assess the rock damage from blasting. It shows great potential as a practical aid to control and get a good quality of the fragmented material in Bamesso-Latet rock quarry.

Downloads

Download data is not yet available.
Abstract
627