[1]
Shrestha, R. et al. 2023. Comparison of Tunnel Construction Cycle with NTNU Model for the Headrace Tunnel of Seti Khola Hydropower Project . Journal of Engineering and Sciences. 2, 1 (Dec. 2023), 9–13. DOI:https://doi.org/10.3126/jes2.v2i1.60371.