DAHAL, Diksha; KUMAR BHATTARAI, Subash; SHRESTHA, Ronald; KHANAL, Pratik; ACHARYA, Sagar. Evaluating the Alignment between Intended Project Durations and Standard Time Cost Models: A Comparative Analysis in Basic Hospital Construction Projects in Nepal. International Journal on Engineering Technology, [S. l.], v. 1, n. 2, p. 211–229, 2024. DOI: 10.3126/injet.v1i2.66688. Disponível em: https://nepjol.info./index.php/injet/article/view/66688. Acesso em: 26 apr. 2025.