[1]
Oke, S. and Charles-Owaba, O. 2007. A Fuzzy Linguistic Approach of Preventive Maintenance Scheduling Cost Optimisation. Kathmandu University Journal of Science, Engineering and Technology. 3, 1 (Jan. 2007). DOI:https://doi.org/10.3126/kuset.v3i1.64178.