[1]
Ghimire, S. 2012. Land Use Planning In Hydropower Development A Case Study Of Upper Tamakoshi Hydroelectric Project. Kathmandu University Journal of Science, Engineering and Technology. 8, 1 (Mar. 2012), 134–141. DOI:https://doi.org/10.3126/kuset.v8i1.6053.