[1]
Shrestha, B. 2024. Extension of Time and Liquidated Damage Issue in Construction Contract: Nepalese Legal Provision and Practice. KTFT Journal. 4, 1 (Oct. 2024), 203–207. DOI:https://doi.org/10.3126/ktftj.v4i1.70449.