[1]
Dhakal, A. and Pathak, S. 2024. Factors Affecting the Timely Construction of National Pride Projects of Nepal: A Case Study Of KTFT Road Project. KTFT Journal. 4, 1 (Oct. 2024), 11–28. DOI:https://doi.org/10.3126/ktftj.v4i1.70170.