[1]
Nepal, K.M. 2004. Construction of a tunnel under thin rock overburden in Middle Marsyangdi Hydroelectric Project, Central Nepal. Journal of Nepal Geological Society. 29, (Oct. 2004), 39 –. DOI:https://doi.org/10.3126/jngs.v29i0.31715.