[1]
P. Raut, R. Shrestha, and P. R. Gautam, “Optimization for Upgradation of Small Hydropower Plant in Nepal: A Case Study of Sundarijal Hydropower Plant”, J. Inst. Engineering, vol. 14, no. 1, pp. 82–95, Jun. 2018.