1.
Yadav GK, Karki NR, Gautam BK. Study of Impact of New Butwal-Gorakhpur 400Kv Transmission Line on the Operation and Reliability of INPS. J. Adv. Coll. Engin. Mgt. [Internet]. 2024 Nov. 14 [cited 2024 Dec. 25];9(1):351-6. Available from: https://nepjol.info./index.php/JACEM/article/view/71463