[1]
P. Tripathi and S. K. Shrestha, “Risk Assessment of Boot Hydropower Projects in Nepal Using Fuzzy Logic Approach”, J. Adv. Coll. Engin. Mgt., vol. 3, pp. 115–125, Jan. 2018.