Tripathi, Pramesh, and Santosh Kumar Shrestha. 2018. “Risk Assessment of Boot Hydropower Projects in Nepal Using Fuzzy Logic Approach”. Journal of Advanced College of Engineering and Management 3 (January):115-25. https://doi.org/10.3126/jacem.v3i0.18965.