Shah, R. K. (2016). An Exploration of Causes for Delay and Cost Overruns In Construction Projects: Case Study of Australia, Malaysia & Ghana. Journal of Advanced College of Engineering and Management, 2, 41–55. https://doi.org/10.3126/jacem.v2i0.16097