[1]
Shah, R.K. 2016. An Exploration of Causes for Delay and Cost Overruns In Construction Projects: Case Study of Australia, Malaysia & Ghana. Journal of Advanced College of Engineering and Management. 2, (Nov. 2016), 41–55. DOI:https://doi.org/10.3126/jacem.v2i0.16097.