[1]
S. B. Pun, “The 400 kV Dhalkebar-Muzaffarpur 140 km Transmission Line Eight Years of Indo-Nepal Labor and Still No Fruit”, Hydro Nepal, vol. 14, pp. 77–82, Oct. 2014.