[1]
Pun, S.B. 2014. The 400 kV Dhalkebar-Muzaffarpur 140 km Transmission Line Eight Years of Indo-Nepal Labor and Still No Fruit. Hydro Nepal: Journal of Water, Energy and Environment. 14, (Oct. 2014), 77–82. DOI:https://doi.org/10.3126/hn.v14i0.11273.