[1]
Kayastha, G.P. 2014. Importance of Contract Administration for Timely Construction of Hydropower Projects without Disputes. Hydro Nepal: Journal of Water, Energy and Environment. 14, (Oct. 2014), 49–51. DOI:https://doi.org/10.3126/hn.v14i0.11265.