Kali Gandaki ‘A’ Hydroelectric Project in Environmental Perspectives
DOI:
https://doi.org/10.3126/hn.v1i0.880Keywords:
Hydropower, environmental monitoring, impacts, mitigation, resettlement, NepalAbstract
Hydropower is one of the cleanest, renewable and environmentally benign sources of energy. Nepal is blessed with immense source of water resources and huge hydropower potential. The Kali Gandaki ‘A’ (KGA) Hydroelectric Project is the largest hydropower project constructed so far in Nepal. The project is a daily pondage type scheme with an installed capacity of 144 MW. The KGA is one of the first largest hydropower projects that has been well studied environmentally and socially in the pre-project, construction and operation stages. A full team of multi-disciplinary professionals was involved during the construction phase to monitor environmental impacts and compliance with contract clauses, and to implement the mitigation measures. Implementation of KGA in what was once considered as a remote area, has resulted in multifold beneficial impacts to the local community. Improvement of public infrastructure, enhanced educational facilities and employment of local populations, including affected families during project construction and operation phase, have enhanced the quality of rural lives. The KGA operation has contributed significantly to Nepal’s power system and has boosted the economic development of the country. Key words: Hydropower; environmental monitoring; impacts; mitigation; resettlement; Nepal Hydro Nepal: Journal of Water, Energy and Environment Vol. I No. 1, 2007 pp. 15-21Downloads
Download data is not yet available.
Abstract
2021
PDF
2563
Downloads
Published
2008-02-14
How to Cite
Thanju, R. P. (2008). Kali Gandaki ‘A’ Hydroelectric Project in Environmental Perspectives. Hydro Nepal: Journal of Water, Energy and Environment, 1, 15–21. https://doi.org/10.3126/hn.v1i0.880
Issue
Section
Articles
License
The copyright of the articles and papers published is held by HYDRO Nepal Journal.
The views and interpretation in this journal are those of author(s), and HYDRO Nepal does not bear any responsibility for the views expressed by authors in the journal.