Energy Banking with India : Path of Least Resistance

Authors

  • Santa Bahadur Pun Nepal Electricity Authority

DOI:

https://doi.org/10.3126/hn.v23i0.20820

Abstract

Once the 456 MW Upper Tamakoshi Hydroelectric Project is commissioned by the end of 2018, Nepal is expected to have surplus energy during the wet/monsoon season of 2019. Nepal’s Energy Ministry has decided to resolve this surplus issue through Energy Banking with India whereby Nepal exports her wet season power for India’s dry season import on “the same volume”. This is an extremely naïve assumption even if it is for the sake of mere negotiation. Discussing the short-sightedness of Energy Banking concept, this article stresses that Nepal should have, instead, activated the other two prevailing instruments of power trading, that of bilateral and regional 2014 Indo-Nepal Electric Power Trade, Cross-Border Transmission and Grid Connectivity Agreement and the 2014 SAARC Framework Agreement for Energy Cooperation (Electricity) respectively. Activating these two agreements would have ‘Open Sesame’-d the doors to Nepal’s growing hydropower capabilities – a win-win situation for both countries.

 

HYDRO Nepal Journal

Journal of Water, Energy and Environment

Issue: 23

Year: 2018

Downloads

Download data is not yet available.
Abstract
1744
PDF
1271

Author Biography

Santa Bahadur Pun, Nepal Electricity Authority

Former Managing Director

Downloads

Published

2018-08-21

How to Cite

Pun, S. B. (2018). Energy Banking with India : Path of Least Resistance. Hydro Nepal: Journal of Water, Energy and Environment, 23, 1–4. https://doi.org/10.3126/hn.v23i0.20820

Issue

Section

Articles