Variation Orders and It's Procedure for Hydropower Construction

Authors

  • Abhushan Neupane

DOI:

https://doi.org/10.3126/hn.v21i0.17816

Keywords:

Hydropower, Variation Orders, Nepal

Abstract

There is lots of construction going in Nepal, of which hydropower construction is also moving in significant pace. As the design and drawings prepared during development of the hydropower project may not fully reflect the construction situation, due to the different circumstances led by the Employer, Engineer or Contractor working for the Project. It has been observed globally that the design during project preparation in hydropower projects needs revision during implementation; hence the basic understanding of Variation Orders is very important to the hydropower professionals. 


HYDRO Nepal Journal

Journal of Water Energy and Environment

Issue: 21, July, 2017

Page: 15-16

Upload Date: July 18, 2017


Downloads

Download data is not yet available.
Abstract
731
PDF
3288

Author Biography

Abhushan Neupane

 

 

Downloads

Published

2017-07-18

How to Cite

Neupane, A. (2017). Variation Orders and It’s Procedure for Hydropower Construction. Hydro Nepal: Journal of Water, Energy and Environment, 21, 15–16. https://doi.org/10.3126/hn.v21i0.17816

Issue

Section

Articles