Variation Orders and It's Procedure for Hydropower Construction
DOI:
https://doi.org/10.3126/hn.v21i0.17816Keywords:
Hydropower, Variation Orders, NepalAbstract
There is lots of construction going in Nepal, of which hydropower construction is also moving in significant pace. As the design and drawings prepared during development of the hydropower project may not fully reflect the construction situation, due to the different circumstances led by the Employer, Engineer or Contractor working for the Project. It has been observed globally that the design during project preparation in hydropower projects needs revision during implementation; hence the basic understanding of Variation Orders is very important to the hydropower professionals.
HYDRO Nepal Journal
Journal of Water Energy and Environment
Issue: 21, July, 2017
Page: 15-16
Upload Date: July 18, 2017
Downloads
Downloads
Published
How to Cite
Issue
Section
License
The copyright of the articles and papers published is held by HYDRO Nepal Journal.
The views and interpretation in this journal are those of author(s), and HYDRO Nepal does not bear any responsibility for the views expressed by authors in the journal.