The Case of Upper Karnali Hydroelectric Project
DOI:
https://doi.org/10.3126/hn.v16i0.12213Keywords:
Upper Karnali, PDAs, Hydropower, NepalAbstract
The Upper Karnali Hydroelectric Project, being one of the most attractive and suitable run-of-river hydropower projects for consumption of the energy in Nepal, should have been developed by Nepal for self consumption through self-construction and self-financing. The author describes that in Nepal things are not happening in a way to safeguard Nepal’s long-term national interest through deriving multiple benefits from modest and gradual way of utilization of better hydropower sites for own sake. Even the meager free entitlements are highly exaggerated in a falsified way to please India instead of striving hard for fulfilling its own need by own efforts.
DOI: http://dx.doi.org/10.3126/hn.v16i0.12213
HYDRO Nepal
Journal of Water Energy and Environment
Issue. 16, 2015 January
Page: 14-17
Upload date: March 1, 2015
Downloads
Downloads
Published
How to Cite
Issue
Section
License
The copyright of the articles and papers published is held by HYDRO Nepal Journal.
The views and interpretation in this journal are those of author(s), and HYDRO Nepal does not bear any responsibility for the views expressed by authors in the journal.