Policy Level Improvement in Hydropower Development
DOI:
https://doi.org/10.3126/hn.v2i0.1156Keywords:
Hydropower Development, Electricity, Economic DevelopmentAbstract
Mother Nature has given Nepal a vast opportunity for hydro energy production, but still the country is reeling under painful load shedding due to an electric power production deficit of 70MW. The main challenge for the country now is to harness the hydropower potentiality, which contributes for its economic development. In Nepal, policy deficiencies and the slow decision making process in electricity sector has resulted in the increased project costs and has reduced the involvement of private sectors and the entrepreneurs. Thus, restructuring and improvements at all policy level is required to overcome various hurdles, and then only will hydropower develop in Nepal. Hydro Nepal: Journal of Water, Energy and Environment Vol. 1, No. 2(2008) pp. 17-18Downloads
Download data is not yet available.
Abstract
864
PDF
1077
Downloads
How to Cite
Thapa, B. T. (2008). Policy Level Improvement in Hydropower Development. Hydro Nepal: Journal of Water, Energy and Environment, 2, 17–18. https://doi.org/10.3126/hn.v2i0.1156
Issue
Section
Articles
License
The copyright of the articles and papers published is held by HYDRO Nepal Journal.
The views and interpretation in this journal are those of author(s), and HYDRO Nepal does not bear any responsibility for the views expressed by authors in the journal.