Policy Level Improvement in Hydropower Development

Authors

  • Bikash Thapa Thapa Kantipur Publications Pvt.

DOI:

https://doi.org/10.3126/hn.v2i0.1156

Keywords:

Hydropower Development, Electricity, Economic Development

Abstract

Mother Nature has given Nepal a vast opportunity for hydro energy production, but still the country is reeling under painful load shedding due to an electric power production deficit of 70MW. The main challenge for the country now is to harness the hydropower potentiality, which contributes for its economic development. In Nepal, policy deficiencies and the slow decision making process in electricity sector has resulted in the increased project costs and has reduced the involvement of private sectors and the entrepreneurs. Thus, restructuring and improvements at all policy level is required to overcome various hurdles, and then only will hydropower develop in Nepal. Hydro Nepal: Journal of Water, Energy and Environment Vol. 1, No. 2(2008) pp. 17-18

Downloads

Download data is not yet available.
Abstract
864
PDF
1077

Author Biography

Bikash Thapa Thapa, Kantipur Publications Pvt.

Senior Reporter/ Sub-Editor Kantipur Publications Pvt. Ltd. His reporting sector includes Water Resources i.e. hydropower, energy, irrigation, drinking water and inundation.

Downloads

How to Cite

Thapa, B. T. (2008). Policy Level Improvement in Hydropower Development. Hydro Nepal: Journal of Water, Energy and Environment, 2, 17–18. https://doi.org/10.3126/hn.v2i0.1156

Issue

Section

Articles